[1]
Seker, H., Onder, F., Capraz, E. and Kurt, U. 2022. General Evaluation of Amasya Provincial Renewable Energy Power Plant Installed Capacity and TEIAS Substation Power. Journal of Engineering Research and Applied Science. 11, 2 (Dec. 2022), 2104-2110.